TURN-KEY · ENGINEERING · INSTALLATION
Bolted tanks engineered to last 50 years. On site in 90 days.
Engineering, supply, installation and civil works under a single accountable team. Sanitation, biogas and industry across Paraguay and LATAM.
METRICS
Numbers from the field, not the brochure.
WELDED vs BOLTED
Why welded steel tanks don’t hold up.
Every year lost to internal corrosion is downtime and capex written off. Glass-fused bolted tanks were designed to remove that risk entirely.
| PARAMETER | WELDED | TECH TANK |
|---|---|---|
| 01 Service life | Welded Up to 15 years with intensive maintenance | Tech Tank 50-year structural warranty |
| 02 On-site time | Welded 6 to 12 months · field welding | Tech Tank 60 to 90 days · bolted modules |
| 03 Corrosion risk | Welded Repaint every 3-5 years, frequent shutdowns | Tech Tank Factory-vitrified, no field touch-ups |
| 04 Accountability | Welded Fragmented suppliers point fingers | Tech Tank One company signs end-to-end |
SOLUTIONS
Technical applications for sanitation, biogas and industry.
Biogas and Biodigesters
Complete systems for biogas plants — vertical biodigesters, covers, piping and technical accessories with hybrid glass-steel technology.
Read more→Industry
Tanks for the food, chemical, pulp & paper, mining and agribusiness industries. Adaptable to each product and process.
Read more→Wastewater Treatment — ETE
Specialized tanks for domestic and industrial wastewater treatment. Resistance to aggressive chemicals and extended service life.
Read more→Water Treatment — ETA
Bolted tanks for capture, decantation, flocculation, filtration and final reservation. Complete infrastructure for potable water systems in urban and rural areas.
Read more→TURN-KEY PROCESS
One team accountable from design to operation.
No more five vendors blaming each other when something goes wrong.
- [ 01 ]
Engineering
Structural calculation, hydraulic layout and civil-works coordination.
- [ 02 ]
Supply
Glass-fused steel with batch QC and per-sheet serialised traceability.
- [ 03 ]
Installation
In-house crew on site, torque certification and watertight test.
- [ 04 ]
Civil works
Foundation, interconnection and handover under a single contract.
FEATURED PROJECTS
Real cases in operation across LATAM.
INDUSTRIA 13.000 m³
C-Vale
13,000 m³ tank for one of southern Brazil's largest agro-industrial cooperatives.
Ver caso→
INDUSTRIA 8.000 m³
Cargill Uberlândia
Set of bolted silos with geodesic cover for grain storage at Cargill's industrial plant.
Ver caso→
INDUSTRIA Ecuador Operation
Glass-fused bolted tanks for food industry in Ecuador.
Ver caso→QUOTE · CONFIDENTIAL · 5 DAYS
Need a tank that actually lasts?
Send the basics of your project and we return a technical quote within 5 business days.